Tanggal | Judul | Harga |
---|---|---|
3-4 | Implementasi SNI ISO/IEC 17025:2008 | Rp3.500.000 |
3-4 | Teknik Kalibrasi Volumetric Glassware | Rp3.800.000 |
3-4 | Teknik Kalibrasi Conductivity Meter | Rp4.000.000 |
3-4 | Teknik Evaluasi Hasil QC Lab dan Kompetensi Analis | Rp3.800.000 |
3-4 | Verifikasi Hasil Kalibrasi & Evaluasi Intermediate Check | Rp3.800.000 |
4-5 | Teknik Kalibrasi Tekanan (Pressure Gauge Digital Oil/Pneumatic) | Rp4.000.000 |
5-6 | Dokumentasi SNI ISO/IEC 17025:2008 | Rp3.500.000 |
5-6 | Sistem Pengukuran Gas dengan Flowmeter | Rp4.500.000 |
5-6 | Teknik Analisis Spektrofotometri Serapan Atom (AAS) Graphite Furnace | Rp4.500.000 |
5-6 | Sampling Control for Testing Sample | Rp3.800.000 |
5-6 | Implementasi K3 di Laboratorium | Rp4.000.000 |
10-11 | Internal Audit SNI ISO/IEC 17025:2008 | Rp3.500.000 |
10-11 | Teknik Kalibrasi Gaya (Load Cell) | Rp4.000.000 |
10-11 | Teknik Analisis Kromatografi Cair Kinerja Ultra (UPLC) | Rp4.500.000 |
10-11 | Pembuatan Contoh Uji Profisiensi dan Bahan Acuan Sekunder | Rp4.000.000 |
11-12 | Teknik Kalibrasi Massa (Anak Timbangan) | Rp3.800.000 |
12-13 | Teknik Investigasi dan Closing Temuan Asesmen Lab | Rp3.800.000 |
12-13 | Teknik Kalibrasi Suhu (Termokopel) | Rp4.000.000 |
12-13 | Teknik Analisis Kromatografi Gas Spektrometri Massa (GC-MS) | Rp4.500.000 |
12-13 | Estimasi Ketidakpastian Pengukuran pada Analisis Spektrofotometri (UV-Vis, FT-IR, AAS) | Rp3.800.000 |
17-18 | Implementasi ISO/IEC 17020:2012 | Rp3.500.000 |
17-18 | Teknik Analisis Inductively Coupled Plasma (ICP) MS | Rp4.500.000 |
17-18 | Estimasi Ketidakpastian Pengukuran Dimensi, Massa dan Volume | Rp3.800.000 |
17-18 | Kalibrasi, Verifikasi dan Troubleshooting pada GC-MS | Rp4.000.000 |
19-20 | Internal Audit ISO/IEC 17020:2012 | Rp3.500.000 |
19-20 | Teknik Kalibrasi Dimensi (Micrometer & Caliper) | Rp4.000.000 |
19-20 | Teknik Analisis Spektrofotometri Infra Merah (IR/FT-IR) | Rp4.000.000 |
19-20 | Kalibrasi, Verifikasi dan Troubleshooting pada UV-Vis | Rp4.000.000 |
24-25 | Dokumentasi SNI ISO 15189:2009 | Rp3.500.000 |
24-25 | Teknik Kalibrasi Listrik (Oscilloscope & Avometer Analog) | Rp4.000.000 |
24-25 | Teknik Analisis PCR-Elisa | Rp4.500.000 |
24-25 | Manajemen Kompetensi Personil Kalibrasi | Rp3.800.000 |
26-27 | Teknik Supervisi dan Inspeksi Mutu | Rp3.500.000 |
26-27 | Teknik Kalibrasi Suhu (Oven dan Furnace) | Rp4.000.000 |
26-27 | Teknik Kalibrasi Listrik (Sine Wave Generator) | Rp4.000.000 |
26-27 | Quality Control Laboratorium | Rp3.800.000 |
26-27 | Verifikasi dan Validasi Metode Spektrofotometri UV-Vis | Rp3.800.000 |
3-4 | Implementasi ISO 9001:2008 | Rp3.300.000 |
3-4 | Zero Defect with Poka Yoke | Rp3.500.000 |
3-4 | Statistical Process Control & Capability Analysis with MS EXCEL | Rp3.500.000 |
3-4 | Project Management using Microsoft Project 2010 | Rp4.000.000 |
3-4 | Formulating Strategy-Based Initiatives with Balanced Scorecard | Rp3.500.000 |
5-6 | Executive Introduction of ISO/TS 16949:2009 | Rp3.800.000 |
5-6 | Project Cost & Budgeting Strategies | Rp4.000.000 |
5-6 | Developing Effective Maintenance with Reliability-centred Maintenance | Rp4.000.000 |
5-6 | Achieving Zero Breakdown with Total Productive Maintenance | Rp3.800.000 |
5-6 | Continous Improvement Proses Produksi dengan Simulasi Promodel | Rp4.000.000 |
10-11 | Internal Audit ISO 9001:2008 | Rp3.300.000 |
10-11 | Document Control | Rp3.500.000 |
10-11 | Implementasi 6S (5S + Safety) | Rp3.500.000 |
10-11 | Executive Awareness of Six Sigma Program | Rp3.800.000 |
10-11 | Statistical Process Control & Capability Analysis with MINITAB | Rp3.500.000 |
10-11 | Designing Products and Services with Quality Function Deployment (QFD) | Rp3.800.000 |
11-12 | Pengolahan dan Analisis Proses dengan Statistika Industri | Rp5.000.000 |
12-13 | E-document Management System | Rp3.500.000 |
12-13 | Acceptance Sampling Plan (ASQ) | Rp4.000.000 |
12-13 | Cost of Quality Executive Overview | Rp3.500.000 |
17-18 | Implementasi ISO 9001 + IWA 2 | Rp3.300.000 |
17-18 | Implementasi ISO 9001:2015 | Rp3.300.000 |
17-18 | Strategic Cost Reduction for Competitive Advantage | Rp3.500.000 |
19-20 | Dokumentasi ISO 9001:2015 | Rp3.300.000 |
19-20 | Teknik Pengujian Tabung LPG | Rp3.500.000 |
24-25 | Dokumentasi ISO 9001:2008 | Rp3.300.000 |
24-25 | Internal Audit ISO 9001:2015 | Rp3.300.000 |
24-25 | Lean Six Sigma | Rp4.000.000 |
24-25 | Acceptance Sampling Plan (ISO 2859, MIL STD 105E & 414) | Rp4.000.000 |
24-25 | Managing Failure with Failure Mode and Effect Analysis (FMEA) | Rp3.800.000 |
24-26 | Audit Internal Integrasi Sistem ISO 9001, ISO 14001 & OHSAS 18001 (Based on ISO 19011) | Rp4.500.000 |
26-27 | Implementasi 5S (Seiro, Seiton, Seiso, Seiketsu, Shitsuke) | Rp3.500.000 |
26-27 | Improvement with Quality Control Circle (QCC) | Rp3.500.000 |
26-27 | Managing Failure with P-M and Why - why Analysis | Rp4.000.000 |
3-4 | Electrical Submersible Pumps | Rp4.000.000 |
3-4 | Electricity For Non Electrician | Rp4.000.000 |
3-4 | Electric Motor ( Operation, Maintenance and Trouble Shooting) | Rp4.000.000 |
3-5 | ROLLER BEARINGS (Basic, Operation, Maintenance and Troubleshooting) | Rp5.500.000 |
3-5 | High Voltage Equipment and Switchgear (Operation and Maintenance) | Rp5.500.000 |
3-5 | Power Electronics and Drives | Rp4.000.000 |
5-6 | Medium Voltage Systems and Equipment (Operation and Maintenance) | Rp4.000.000 |
10-11 | Low Voltage Electrical Power System Distribution | Rp4.000.000 |
10-12 | TURBO COMPRESSORS (Operation, Maintenance and Troubleshooting) | Rp5.500.000 |
10-12 | Electrical Power Motor – Generator (Operation, Protection and Maintanance) | Rp5.500.000 |
10-12 | 150 Kv Electrical Transmission Operation (Equipment and Maintenance) | Rp5.500.000 |
11-12 | Teknik Lubrikasi | Rp4.000.000 |
11-13 | Manajemen Perawatan Bangunan Gedung Dan Fasilitas (Building Maintenance) | Rp5.500.000 |
11-13 | Electrical Powerline | Rp5.500.000 |
12-13 | Motor Induksi (Maintenance & Troubleshooting) | Rp4.000.000 |
12-13 | Low Voltage Distribution and Protection Systems | Rp4.000.000 |
17-19 | STEAM TURBINES (Operation, maintenance and troubleshooting) | Rp5.500.000 |
17-19 | Power Transformer Diagnosis, Monitoring and Analysis | Rp5.500.000 |
19-20 | Belt Conveyor (Maintenance & Troubleshooting) | Rp4.000.000 |
24-25 | Vibration Analysis and Troubleshooting | Rp4.000.000 |
24-25 | PLC Programming Principle and Practice Simulations | Rp4.000.000 |
24-25 | Process Control & Loop Tunning | Rp4.000.000 |
24-26 | Electrical Power System Analysis Using Etap | Rp5.500.000 |
26-27 | Electrical Maintenance : Low and Medium Voltage Networks | Rp4.000.000 |
26-27 | Electrostatic Ignition Of Fire and Explosion | Rp4.000.000 |
26-27 | Advance Instrument and Control | Rp4.000.000 |
3-4 | Dispatch Management System | Rp4.000.000 |
3-4 | Production Planning and Inventory Control (PPIC) | Rp4.000.000 |
3-4 | Fundamental of Supply Chain Management & Logistic | Rp3.500.000 |
3-4 | Basic of Procurement Management | Rp3.500.000 |
3-4 | Fleet Management | Rp3.800.000 |
5-6 | Green Logistics | Rp3.800.000 |
5-6 | Safety In Logistics | Rp3.800.000 |
10-11 | Change Management in SCM | Rp4.000.000 |
10-11 | Integrated Logistic Management | Rp4.000.000 |
11-12 | Modern Warehouse Design | Rp4.000.000 |
12-13 | Basic of Transportation and Distribution | Rp3.500.000 |
12-13 | KPI Design for Warehouse | Rp3.800.000 |
17-18 | Vendor Management Inventory | Rp4.000.000 |
19-20 | Decision Making with Analytical Hierarchy Process (AHP) | Rp4.000.000 |
24-25 | Vendor Analysis and Selection | Rp4.000.000 |
24-25 | Material Management | Rp3.500.000 |
26-27 | Basic of Logistics Practices | Rp3.500.000 |
26-27 | E-Procurement | Rp3.800.000 |
26-27 | Vendor Selection | Rp4.000.000 |
26-27 | Competitor Market Analysis | Rp4.000.000 |
26-27 | IMPLEMENTASI ISO 28001:2007 Sistem Manajemen Keamanan untuk Rantai Pasokan | Rp4.000.000 |
3-4 | Implementasi OHSAS 18001:2007 | Rp3.500.000 |
3-4 | Risk Assessment (Analisa Resiko) Kimia | Rp4.000.000 |
3-4 | Hazard Identification and Risk Assessment (HIRA) | Rp4.000.000 |
3-4 | Pengelolaan Limbah Cair | Rp4.000.000 |
5-6 | Dokumentasi OHSAS 18001:2007 | Rp3.500.000 |
5-6 | Safety Risk Management | Rp4.000.000 |
5-6 | Surat Izin Bekerja (working Permit) | Rp4.000.000 |
5-6 | Pengelolaan Limbah Padat | Rp4.000.000 |
10-11 | Audit Internal OHSAS 18001:2007 | Rp3.500.000 |
10-11 | Audit dan Manajemen Energi di Industri (Based on ISO 50001:2011) | Rp4.000.000 |
10-11 | Implementasi Standar Manajemen Resiko ISO 31000:2009 | Rp3.500.000 |
10-11 | Penanggulangan Tumpahan | Rp4.000.000 |
11-12 | Waste Water Treatment | Rp4.000.000 |
12-13 | Implementasi ISO 14001:2004 | Rp3.500.000 |
12-13 | Green Procurement/RoHS System Guidelines | Rp4.000.000 |
12-13 | Process Safety Management (Awareness) | Rp4.500.000 |
17-18 | Internal Audit ISO 14001:2004 | Rp3.500.000 |
17-18 | Process Hazard Analysis (PHA) Awareness | Rp4.000.000 |
19-20 | Transportasi Bahan Beracun Berbahaya (B3) | Rp4.000.000 |
24-25 | Dokumentasi ISO 14001:2004 | Rp3.500.000 |
24-25 | Monitoring Lingkungan | Rp4.000.000 |
24-26 | Globally Harmonized System (GHS) Sistem Klasifikasi dan Pelabelan Bahan Kimia B3 | Rp4.500.000 |
26-27 | Pembuatan Laporan Lingkungan | Rp4.000.000 |
5-6 | Asset Management | Rp3.500.000 |
12-13 | Effective Cashflow Management | Rp3.500.000 |
17-18 | Financial Statement Analysis | Rp3.500.000 |
19-20 | Basic Accounting | Rp3.500.000 |
24-25 | Teknik Penyusunan Laporan Keuangan | Rp3.500.000 |
26-27 | Petty Cash Management & Administration | Rp3.500.000 |
5-6 | Brand Equity Survey (Methodology & Statistic) | Rp4.500.000 |
17-18 | Basic Statistical Analysis For Marketing Research Using R (Open Source Software) | Rp4.500.000 |
24-25 | Data Mining | Rp4.000.000 |
3-4 | IMPLEMENTASI ISO 260001:2010 Guidance on Social Responsibility | Rp4.000.000 |
3-4 | Fast Track To Be A Super Manager | Rp3.500.000 |
5-6 | Job Analysis | Rp3.500.000 |
5-6 | How to Develop and Implementing Winning KPI | Rp3.500.000 |
10-11 | Strategic HRM and The HR Scorecard | Rp3.500.000 |
11-12 | Strategic Performance Management | Rp3.500.000 |
12-13 | Competency Assessment | Rp3.500.000 |
12-13 | Outsourcing Management | Rp3.500.000 |
17-18 | Human Capital Management | Rp3.500.000 |
17-18 | Competency Based Pay | Rp3.500.000 |
19-20 | HR Metrics: Driving HR Success | Rp3.500.000 |
24-25 | Training of Trainer | Rp3.500.000 |
26-27 | Competency - Based Human Capital Management | Rp3.500.000 |
26-27 | Teknik Survey Kepuasan Karyawan | Rp3.500.000 |
3-4 | Teknologi Gasifikasi Batubara dan Penerapannya | Rp5.000.000 |
3-5 | Model Pengambilan Sampel dan Metoda Perhitungan Cadangan Bijih Nikel | Rp5.500.000 |
5-6 | Teknologi Pemanfaatan Batubara untuk PLTU | Rp5.000.000 |
10-12 | Pengenalan Bahan Peledak dan Proses Peledakan dalam Tambang Terbuka dan Tambang Bawah Tanah | Rp5.500.000 |
11-12 | Teknik Sampling Batubara | Rp5.000.000 |
17-18 | Coal Handling | Rp5.000.000 |
19-20 | Energi Batubara dan Pemanfaatannya | Rp5.000.000 |
24-25 | Teknologi Pengolahan dan Pemanfaatan Batubara | Rp5.000.000 |
3-4 | Dokumentasi ISO 22000:2005 | Rp3.500.000 |
5-6 | Penyusunan Dokumen Sistem Mutu Pangan Organik | Rp3.500.000 |
12-13 | Pelatihan Fasilitator Pertanian Organik | Rp3.500.000 |
17-18 | Implementasi ISO 22000:2005 | Rp3.500.000 |
17-18 | Implementasi HACCP | Rp3.500.000 |
17-18 | Pelatihan Inspektor Organik | Rp3.500.000 |
19-20 | Internal Audit ISO 22000:2005 | Rp3.500.000 |
19-20 | Food Safety Program ( Inspection, Sampling, Pest Management) | Rp3.800.000 |
24-25 | Food Safety System Certification | Rp3.800.000 |
26-27 | Internal Audit FSSC 22000 | Rp3.800.000 |
17-18 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Perkerasan Jalan Beton (Rigid Pavement) | Rp4.500.000 |
19-20 | Pengendalian Mutu Pekerjaan Beton Aspal Panas (Hot Mix) dan Pembuatan Job Mix Formula (JMF) | Rp4.500.000 |
24-25 | Sistem Perkuatan Lereng jalan | Rp4.500.000 |
Pelatihan Bandung, Training Bandung, Pelatihan Indonesia, Training Indonesia, Training Laboratorium, Training konsultan Iso
Senin, 02 November 2015
Jadwal Training Bulan November 2015
Langganan:
Posting Komentar (Atom)
Tidak ada komentar:
Posting Komentar