Kamis, 28 Mei 2015

Jadwal Training Bulan Juli 2015


KategoriTanggalJudulHarga
Laboratorium1-2Estimasi Ketidakpastian Pengukuran Dimensi, Massa dan VolumeRp3,800,000
Laboratorium1-2Implementasi ISO/IEC 17020:2012Rp3,500,000
Laboratorium1-2Implementasi SNI ISO/IEC 17025:2008Rp3,500,000
Laboratorium1-2Kalibrasi, Verifikasi dan Troubleshooting pada GC-MSRp4,000,000
Laboratorium1-2Teknik Analisis Inductively Coupled Plasma (ICP) MSRp4,500,000
Laboratorium1-2Teknik Evaluasi Hasil QC Lab dan Kompetensi AnalisRp3,800,000
Laboratorium1-2Teknik Kalibrasi Suhu (Oven dan Furnace)Rp4,000,000
Laboratorium1-2Teknik Kalibrasi Volumetric GlasswareRp3,800,000
Laboratorium1-2Verifikasi Hasil Kalibrasi & Evaluasi Intermediate CheckRp3,800,000
Laboratorium2-3Dokumentasi SNI ISO/IEC 17025:2008Rp3,500,000
Laboratorium2-3Implementasi K3 di LaboratoriumRp4,000,000
Laboratorium2-3Internal Audit ISO/IEC 17020:2012Rp3,500,000
Laboratorium2-3Kalibrasi, Verifikasi dan Troubleshooting pada UV-VisRp4,000,000
Laboratorium2-3Sampling Control for Testing SampleRp3,800,000
Laboratorium2-3Sistem Pengukuran Gas dengan FlowmeterRp4,500,000
Laboratorium2-3Teknik Analisis Spektrofotometri Infra Merah (IR/FT-IR)Rp4,000,000
Laboratorium2-3Teknik Analisis Spektrofotometri Serapan Atom (AAS) Graphite FurnaceRp4,500,000
Laboratorium2-3Teknik Kalibrasi Conductivity MeterRp4,000,000
Laboratorium2-3Teknik Kalibrasi Dimensi (Micrometer & Caliper)Rp4,000,000
Laboratorium7-8Dokumentasi SNI ISO 15189:2009Rp3,500,000
Laboratorium7-8Manajemen Kompetensi Personil KalibrasiRp3,800,000
Laboratorium7-8Pembuatan Contoh Uji Profisiensi dan Bahan Acuan SekunderRp4,000,000
Laboratorium7-8Teknik Analisis Kromatografi Cair Kinerja Ultra (UPLC)Rp4,500,000
Laboratorium7-8Teknik Analisis PCR-ElisaRp4,500,000
Laboratorium7-8Teknik Kalibrasi Listrik (Oscilloscope & Avometer Analog)Rp4,000,000
Laboratorium7-8Teknik Kalibrasi Massa (Anak Timbangan)Rp3,800,000
Laboratorium8-9Teknik Kalibrasi Tekanan (Pressure Gauge Digital Oil/Pneumatic)Rp4,000,000
Laboratorium9-10Internal Audit SNI ISO/IEC 17025:2008Rp3,500,000
Laboratorium9-10Teknik Investigasi dan Closing Temuan Asesmen LabRp3,800,000
Laboratorium9-10Teknik Kalibrasi Gaya (Load Cell)Rp4,000,000
Laboratorium9-10Teknik Kalibrasi Listrik (Sine Wave Generator)Rp4,000,000
Laboratorium9-10Teknik Kalibrasi Suhu (Termokopel)Rp4,000,000
Laboratorium9-10Teknik Supervisi dan Inspeksi MutuRp3,500,000
Quality & Production1-2Formulating Strategy-Based Initiatives with Balanced ScorecardRp3,500,000
Quality & Production1-2Implementasi ISO 9001:2008Rp3,300,000
Quality & Production1-2Project Management using Microsoft Project 2010Rp4,000,000
Quality & Production1-2Statistical Process Control & Capability Analysis with MS EXCELRp3,500,000
Quality & Production1-2Strategic Cost Reduction for Competitive AdvantageRp3,500,000
Quality & Production1-2Zero Defect with Poka YokeRp3,500,000
Quality & Production2-3Achieving Zero Breakdown with Total Productive MaintenanceRp3,800,000
Quality & Production2-3Developing Effective Maintenance with Reliability-centred MaintenanceRp4,000,000
Quality & Production2-3Dokumentasi ISO 9001:2008Rp3,300,000
Quality & Production2-3Executive Introduction of ISO/TS 16949:2009Rp3,800,000
Quality & Production2-3Project Cost & Budgeting StrategiesRp4,000,000
Quality & Production2-3Teknik Pengujian Tabung LPGRp3,500,000
Quality & Production7-8Acceptance Sampling Plan (ISO 2859, MIL STD 105E & 414)Rp4,000,000
Quality & Production7-8Document ControlRp3,500,000
Quality & Production7-8Executive Awareness of Six Sigma ProgramRp3,800,000
Quality & Production7-8Implementasi 6S (5S + Safety)Rp3,500,000
Quality & Production7-8Implementasi ISO 9001 + IWA 2Rp3,300,000
Quality & Production7-8Internal Audit ISO 9001:2008Rp3,300,000
Quality & Production7-8Lean Six SigmaRp4,000,000
Quality & Production7-8Managing Failure with Failure Mode and Effect Analysis (FMEA)Rp3,800,000
Quality & Production7-8Pengolahan dan Analisis Proses dengan Statistika IndustriRp5,000,000
Quality & Production7-8Statistical Process Control & Capability Analysis with MINITABRp3,500,000
Quality & Production7-9Audit Internal Integrasi Sistem ISO 9001, ISO 14001 & OHSAS 18001 (Based on ISO 19011)Rp4,500,000
Quality & Production9-10Continous Improvement Proses Produksi dengan Simulasi PromodelRp4,000,000
Quality & Production9-10Cost of Quality Executive OverviewRp3,500,000
Quality & Production9-10E-document Management SystemRp3,500,000
Quality & Production9-10Implementasi 5S (Seiro, Seiton, Seiso, Seiketsu, Shitsuke)Rp3,500,000
Quality & Production9-10Implementasi ISO 9001:2015Rp3,300,000
Quality & Production9-10Managing Failure with P-M and Why - why AnalysisRp4,000,000
Quality & Production9-10Quality Control LaboratoriumRp3,800,000
Quality & Production9-10Teknik Analisis Kromatografi Gas Spektrometri Massa (GC-MS)Rp4,500,000
Quality & Production9-10Acceptance Sampling Plan (ASQ)Rp4,000,000
Quality & Production28-29Dokumentasi ISO 9001:2015Rp3,300,000
Quality & Production30-31Internal Audit ISO 9001:2015Rp3,300,000
Machine & Electrical1-2Electrical Submersible PumpsRp4,000,000
Machine & Electrical1-2Electricity For Non ElectricianRp4,000,000
Machine & Electrical1-2Advance Instrument and ControlRp4,000,000
Machine & Electrical1-2Electric Motor ( Operation, Maintenance and Trouble Shooting)Rp4,000,000
Machine & Electrical1-2Power Electronics and DrivesRp4,000,000
Machine & Electrical1-3ROLLER BEARINGS (Basic, Operation, Maintenance and Troubleshooting)Rp5,500,000
Machine & Electrical1-3STEAM TURBINES (Operation, maintenance and troubleshooting)Rp5,500,000
Machine & Electrical1-3Power Transformer Diagnosis, Monitoring and AnalysisRp5,500,000
Machine & Electrical1-3High Voltage Equipment and Switchgear (Operation and Maintenance)Rp5,500,000
Machine & Electrical2-3Belt Conveyor (Maintenance & Troubleshooting)Rp4,000,000
Machine & Electrical2-3Teknik LubrikasiRp4,000,000
Machine & Electrical2-3Medium Voltage Systems and Equipment (Operation and Maintenance)Rp4,000,000
Machine & Electrical7-8PLC Programming Principle and Practice SimulationsRp4,000,000
Machine & Electrical7-8Low Voltage Electrical Power System Distribution Rp4,000,000
Machine & Electrical7-8Process Control & Loop TunningRp4,000,000
Machine & Electrical7-9TURBO COMPRESSORS (Operation, Maintenance and Troubleshooting)Rp5,500,000
Machine & Electrical7-9Electrical Power System Analysis Using EtapRp5,500,000
Machine & Electrical7-9Manajemen Perawatan Bangunan Gedung Dan Fasilitas (Building Maintenance)Rp5,500,000
Machine & Electrical7-9Electrical PowerlineRp5,500,000
Machine & Electrical9-10Motor Induksi (Maintenance & Troubleshooting)Rp4,000,000
Machine & Electrical9-10Electrical Maintenance : Low and Medium Voltage NetworksRp4,000,000
Machine & Electrical9-10Electrostatic Ignition Of Fire and ExplosionRp4,000,000
Machine & Electrical9-10Low Voltage Distribution and Protection SystemsRp4,000,000
Machine & Electrical28-30Electrical Power Motor – Generator (Operation, Protection and Maintanance) Rp5,500,000
Supply Chain1-2Fundamental of Supply Chain Management & LogisticRp3,500,000
Supply Chain1-2Basic of Procurement ManagementRp3,500,000
Supply Chain1-2Fleet ManagementRp3,800,000
Supply Chain1-2Vendor Management InventoryRp4,000,000
Supply Chain1-2Dispatch Management SystemRp4,000,000
Supply Chain2-3Green LogisticsRp3,800,000
Supply Chain2-3Safety In LogisticsRp3,800,000
Supply Chain2-3Modern Warehouse DesignRp4,000,000
Supply Chain2-3Production Planning and Inventory Control (PPIC)Rp4,000,000
Supply Chain2-3Decision Making with Analytical Hierarchy Process (AHP)Rp4,000,000
Supply Chain7-8Change Management in SCMRp4,000,000
Supply Chain7-8Vendor Analysis and SelectionRp4,000,000
Supply Chain7-8Material ManagementRp3,500,000
Supply Chain7-8Integrated Logistic ManagementRp4,000,000
Supply Chain9-10Basic of Logistics PracticesRp3,500,000
Supply Chain9-10Basic of Transportation and DistributionRp3,500,000
Supply Chain9-10KPI Design for WarehouseRp3,800,000
Supply Chain9-10E-ProcurementRp3,800,000
Supply Chain9-10Vendor SelectionRp4,000,000
Supply Chain9-10Competitor Market AnalysisRp4,000,000
Supply Chain9-10IMPLEMENTASI ISO 28001:2007 Sistem Manajemen Keamanan untuk Rantai PasokanRp4,000,000
Health, Safety1-2Implementasi OHSAS 18001:2007Rp3,500,000
Health, Safety1-2Risk Assessment (Analisa Resiko) KimiaRp4,000,000
Health, Safety1-2Hazard Identification and Risk Assessment (HIRA)Rp4,000,000
Health, Safety1-2Process Hazard Analysis (PHA) AwarenessRp4,000,000
Health, Safety1-2Pengelolaan Limbah CairRp4,000,000
Health, Safety2-3Dokumentasi OHSAS 18001:2007Rp3,500,000
Health, Safety2-3Dokumentasi ISO 14001:2004Rp3,500,000
Health, Safety2-3Transportasi Bahan Beracun Berbahaya (B3)Rp4,000,000
Health, Safety2-3Waste Water TreatmentRp4,000,000
Health, Safety2-3Safety Risk ManagementRp4,000,000
Health, Safety2-3Surat Izin Bekerja (working Permit)Rp4,000,000
Health, Safety2-3Pengelolaan Limbah PadatRp4,000,000
Health, Safety7-8Audit Internal OHSAS 18001:2007Rp3,500,000
Health, Safety7-8Internal Audit ISO 14001:2004Rp3,500,000
Health, Safety7-8Globally Harmonized System (GHS) Sistem Klasifikasi dan Pelabelan Bahan Kimia B3Rp4,500,000
Health, Safety7-8Audit dan Manajemen Energi di Industri (Based on ISO 50001:2011)Rp4,000,000
Health, Safety7-8Implementasi Standar Manajemen Resiko ISO 31000:2009Rp3,500,000
Health, Safety7-8Penanggulangan TumpahanRp4,000,000
Health, Safety7-8Monitoring LingkunganRp4,000,000
Health, Safety9-10Implementasi ISO 14001:2004Rp3,500,000
Health, Safety9-10Green Procurement/RoHS System GuidelinesRp4,000,000
Health, Safety9-10Process Safety Management (Awareness)Rp4,500,000
Health, Safety9-10Pembuatan Laporan LingkunganRp4,000,000
Finance1-2Financial Statement AnalysisRp3,500,000
Finance2-3Asset ManagementRp3,500,000
Finance2-3Basic AccountingRp3,500,000
Finance7-8Teknik Penyusunan Laporan KeuanganRp3,500,000
Finance9-10Petty Cash Management & AdministrationRp3,500,000
Finance9-10Effective Cashflow ManagementRp3,500,000
Marketing1-2Basic Statistical Analysis For Marketing Research Using R (Open Source Software)Rp4,500,000
Marketing2-3Brand Equity Survey (Methodology & Statistic)Rp4,500,000
Marketing7-8Data MiningRp4,000,000
HRD1-2Human Capital Management Rp3,500,000
HRD1-2Competency Based PayRp3,500,000
HRD1-2IMPLEMENTASI ISO 260001:2010 Guidance on Social ResponsibilityRp4,000,000
HRD1-2Fast Track To Be A Super ManagerRp3,500,000
HRD2-3Job AnalysisRp3,500,000
HRD2-3HR Metrics: Driving HR SuccessRp3,500,000
HRD2-3How to Develop and Implementing Winning KPIRp3,500,000
HRD7-8Strategic HRM and The HR ScorecardRp3,500,000
HRD7-8Training of TrainerRp3,500,000
HRD8-9Strategic Performance Management Rp3,500,000
HRD9-10Competency - Based Human Capital ManagementRp3,500,000
HRD9-10Competency Assessment Rp3,500,000
HRD9-10Teknik Survey Kepuasan KaryawanRp3,500,000
HRD9-10Outsourcing ManagementRp3,500,000
Minning, Oil & Gas1-2Coal HandlingRp5,000,000
Minning, Oil & Gas1-2Teknologi Gasifikasi Batubara dan PenerapannyaRp5,000,000
Minning, Oil & Gas1-3Model Pengambilan Sampel dan Metoda Perhitungan Cadangan Bijih NikelRp5,500,000
Minning, Oil & Gas2-3Energi Batubara dan PemanfaatannyaRp5,000,000
Minning, Oil & Gas2-3Teknologi Pemanfaatan Batubara untuk PLTURp5,000,000
Minning, Oil & Gas7-8Teknologi Pengolahan dan Pemanfaatan BatubaraRp5,000,000
Minning, Oil & Gas7-9Pengenalan Bahan Peledak dan Proses Peledakan dalam Tambang Terbuka dan Tambang Bawah TanahRp5,500,000
Minning, Oil & Gas8-9Teknik Sampling BatubaraRp5,000,000
Food & Agriculture1-2Implementasi ISO 22000:2005Rp3,500,000
Food & Agriculture1-2Implementasi HACCPRp3,500,000
Food & Agriculture1-2Pelatihan Inspektor OrganikRp3,500,000
Food & Agriculture2-3Dokumentasi ISO 22000:2005Rp3,500,000
Food & Agriculture2-3Penyusunan Dokumen Sistem Mutu Pangan OrganikRp3,500,000
Food & Agriculture2-3Food Safety Program ( Inspection, Sampling, Pest Management)Rp3,800,000
Food & Agriculture7-8Internal Audit ISO 22000:2005Rp3,500,000
Food & Agriculture7-8Food Safety System CertificationRp3,800,000
Food & Agriculture9-10Pelatihan Fasilitator Pertanian OrganikRp3,500,000
Food & Agriculture9-10Internal Audit FSSC 22000Rp3,800,000
Civil & Contruction14-15Pelaksanaan dan Pengendalian Mutu Pekerjaan Perkerasan Jalan Beton (Rigid Pavement)Rp4,500,000
Civil & Contruction21-22Pengendalian Mutu Pekerjaan Beton Aspal Panas (Hot Mix) dan Pembuatan Job Mix Formula (JMF)Rp4,500,000
Civil & Contruction23-24Sistem Perkuatan Lereng jalanRp4,500,000