Status | Tanggal | Judul | Harga |
---|---|---|---|
Hub Admin | 6-7 | Implementasi SNI ISO/IEC 17025:2008 | Rp3,500,000 |
Hub Admin | 6-7 | Teknik Analisis Data di Laboratorium | Rp4,000,000 |
Hub Admin | 6-7 | Teknik Kalibrasi Listrik (Frequency Counter & Function Generator) | Rp4,000,000 |
Hub Admin | 6-7 | Teknik Analisis IC (Ion Chromatography) | Rp4,500,000 |
Hub Admin | 6-7 | Estimasi Ketidakpastian Pengukuran Hasil Kalibrasi | Rp3,800,000 |
Hub Admin | 11-12 | Dokumentasi SNI ISO/IEC 17025:2008 | Rp3,500,000 |
Hub Admin | 11-12 | Teknik Kalibrasi Listrik (Insulation Tester & Withstanding Voltage) | Rp4,000,000 |
Hub Admin | 11-12 | Sistem Pengukuran Air dengan Flowmeter | Rp4,500,000 |
Hub Admin | 11-12 | Teknik Analisis Scanning Electron Microscope (SEM) | Rp4,500,000 |
Hub Admin | 11-12 | Penanganan Bahan Acuan Bersertifikat (CRM) | Rp4,000,000 |
Hub Admin | 11-12 | Kalibrasi, Verifikasi dan Troubleshooting pada GC | Rp4,000,000 |
Hub Admin | 13-14 | Internal Audit SNI ISO/IEC 17025:2008 | Rp3,500,000 |
Hub Admin | 13-14 | Teknik Kalibrasi Gaya (Proving Ring) | Rp4,000,000 |
Hub Admin | 13-14 | Sistem Pengukuran Minyak dengan Flowmeter | Rp4,500,000 |
Hub Admin | 13-14 | Teknik Analisis Spektrofotometri Serapan Atom (AAS) Flame | Rp4,500,000 |
Hub Admin | 13-14 | Quality Assurance Laboratorium | Rp3,800,000 |
Hub Admin | 13-14 | Verifikasi dan Validasi Metode Uji Kimia | Rp3,800,000 |
Hub Admin | 18-19 | Sistem Manajemen Informatika Laboratorium | Rp4,000,000 |
Hub Admin | 18-19 | Teknik Kalibrasi Suhu (Termometer) | Rp4,000,000 |
Hub Admin | 18-19 | Teknik Analisis Kromatografi Cair Kinerja Tinggi (HPLC) | Rp4,500,000 |
Hub Admin | 18-19 | Kaji Ulang Manajemen dan Pengendalian Sistem Laboratorium | Rp3,800,000 |
Hub Admin | 18-19 | Verifikasi dan Validasi Metode Kromatografi Gas (GC) | Rp3,800,000 |
Hub Admin | 19-20 | Teknik Kalibrasi Massa (Timbangan) | Rp3,800,000 |
Hub Admin | 20-21 | Dokumentasi ISO/IEC 17020:2012 | Rp3,500,000 |
Hub Admin | 20-21 | Teknik Kalibrasi Suhu (Termohigrometer) | Rp4,000,000 |
Hub Admin | 20-21 | Teknik Analisis Kromatografi Gas (GC) | Rp4,500,000 |
Hub Admin | 20-21 | Uji Profisiensi Laboratorium (SNI-ISO/IEC 17043-2010) | Rp3,800,000 |
Hub Admin | 20-21 | Manajemen Peralatan Lab & Evaluasi Performa Alat ukur | Rp3,800,000 |
Hub Admin | 25-26 | Implementasi SNI ISO 15189:2009 | Rp3,500,000 |
Hub Admin | 25-26 | Sistem Pengukuran dan Kalibrasi | Rp3,800,000 |
Hub Admin | 25-26 | Teknik Kalibrasi pH Meter | Rp4,000,000 |
Hub Admin | 25-26 | Teknik Analisis Inductively Coupled Plasma (ICP) OES | Rp4,500,000 |
Hub Admin | 25-26 | Estimasi Ketidakpastian Pengukuran Analisis Kimia | Rp3,800,000 |
Hub Admin | 25-26 | Pengendalian Alat dan Bahan Kimia di Laboratorium | Rp4,000,000 |
Hub Admin | 27-28 | Internal Audit SNI ISO 15189:2009 | Rp3,500,000 |
Hub Admin | 27-28 | Teknik Kalibrasi Tekanan (Pressure Gauge Analog Oil/Pneumatic) | Rp4,000,000 |
Hub Admin | 27-28 | Teknik Kalibrasi Listrik (Multimeter & RF Power Meter) | Rp4,000,000 |
Hub Admin | 27-28 | Teknik Analisis Spektrofotometri UV-Vis | Rp4,000,000 |
Hub Admin | 27-28 | Estimasi Ketidakpastian Pengukuran pada Analisis Kromatografi | Rp3,800,000 |
Hub Admin | 4-5 | Implementasi ISO 9001:2015 | Rp3,300,000 |
Hub Admin | 6-7 | Implementasi ISO 9001:2008 | Rp3,300,000 |
Hub Admin | 6-7 | Implementasi ISO 9001 + IWA 2 | Rp3,300,000 |
Hub Admin | 6-7 | HORENSO (Houkoku-Renraku-Soudan) Japanese Communication System | Rp3,500,000 |
Hub Admin | 6-7 | Six Sigma Quality Using R (Open Source Software) | Rp4,000,000 |
Hub Admin | 6-7 | Statistical Process Control & Capability Analysis with MS EXCEL | Rp3,500,000 |
Hub Admin | 6-7 | Design of Experiment (DoE) | Rp3,800,000 |
Hub Admin | 6-7 | Manajemen Pemeliharaan Peralatan Industri Berbasis Komputer (CMMS) | Rp3,800,000 |
Hub Admin | 6-7 | Acceptance Sampling Plan (ASQ) | Rp4,000,000 |
Hub Admin | 11-12 | Dokumentasi ISO 9001:2008 | Rp3,300,000 |
Hub Admin | 11-12 | Project Risk Management | Rp4,000,000 |
Hub Admin | 11-12 | Lean Manufacturing | Rp3,500,000 |
Hub Admin | 13-14 | Internal Audit ISO 9001:2015 | Rp3,300,000 |
Hub Admin | 13-14 | Implementasi 5S (Seiro, Seiton, Seiso, Seiketsu, Shitsuke) | Rp3,500,000 |
Hub Admin | 13-14 | Implementasi 6S (5S + Safety) | Rp3,500,000 |
Hub Admin | 13-14 | Total Quality Management (TQM) | Rp3,800,000 |
Hub Admin | 13-14 | Statistical Process Control & Capability Analysis with MINITAB | Rp3,500,000 |
Hub Admin | 13-14 | Basic of Project Management | Rp3,800,000 |
Hub Admin | 13-14 | Manufacturing Performance Indicator | Rp4,000,000 |
Hub Admin | 13-14 | Failure Analysis with Fault Tree Analysis (FTA) & Root Cause Failure Analysis (RCFA) | Rp4,000,000 |
Hub Admin | 18-19 | Internal Audit ISO 9001:2008 | Rp3,300,000 |
Hub Admin | 18-19 | Acceptance Sampling Plan (ISO 2859, MIL STD 105E & 414) | Rp4,000,000 |
Hub Admin | 20-21 | Dokumentasi ISO 9001:2015 | Rp3,300,000 |
Hub Admin | 20-21 | Product Development with APQP and PPAP | Rp3,800,000 |
Hub Admin | 20-21 | Maintenance Priority Index (MPI) dengan Proses SERP (Sistem & Equipment Reliability & Prioritization) | Rp4,000,000 |
Hub Admin | 25-26 | Integrasi Sistem Manajemen ISO 9001, ISO 14001 & OHSAS 18001 (Sistem PAS 99) | Rp3,500,000 |
Hub Admin | 25-26 | Teknik Menyusun Standard Operating Procedure (SOP) | Rp3,300,000 |
Hub Admin | 25-26 | Measurement System Analysis (MSA) with MINITAB | Rp3,800,000 |
Hub Admin | 25-26 | Business Process Reengineering | Rp3,500,000 |
Hub Admin | 26-27 | Pengolahan dan Analisis Data Kegagalan | Rp5,000,000 |
Hub Admin | 27-28 | 5S Toyota Production Systems (KAIZEN) | Rp3,800,000 |
Hub Admin | 27-28 | Design of Experiment (DoE) for Pharmaceutical | Rp3,800,000 |
Hub Admin | 27-28 | Teknik Pengendalian Korosi | Rp3,500,000 |
Hub Admin | 11-12 | Low Voltage Equipment and Switchgear (Operation and Maintenance) | Rp4,000,000 |
Hub Admin | 11-12 | Implementasi SCADApada Instalasi Industri | Rp4,000,000 |
Hub Admin | 11-13 | STEAM BOILERS (Operation, maintenance and troubleshooting) | Rp5,500,000 |
Hub Admin | 11-13 | Industrial Electrical Installations | Rp5,500,000 |
Hub Admin | 13-14 | Diesel Electrical Set Operation and Maintenance | Rp4,000,000 |
Hub Admin | 13-14 | Basic Power System Protections | Rp4,000,000 |
Hub Admin | 13-14 | Combustion and Burner | Rp4,000,000 |
Hub Admin | 13-14 | Electrical Distribution System Protection | Rp4,000,000 |
Hub Admin | 18-19 | Electrical Power Distribution Networks and Controls | Rp4,000,000 |
Hub Admin | 18-19 | Keselamatan dan Kesehatan Kerja (K3) Listrik | Rp4,000,000 |
Hub Admin | 18-20 | Power and Distribution Transformers (Operation and Maintenance) | Rp5,500,000 |
Hub Admin | 18-20 | Electrical Safety and Power System Protection | Rp5,500,000 |
Hub Admin | 18-20 | DYNAMIC PUMPS (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
Hub Admin | 20-21 | Hydraulic Power System | Rp4,000,000 |
Hub Admin | 20-21 | Low Voltage Systems and Equipment (Operation And Maintenance) | Rp4,000,000 |
Hub Admin | 20-21 | Electrical Selection In Hazardous Area for Offshore Facilities | Rp4,000,000 |
Hub Admin | 20-21 | Basic Geothermal System, Mechanical and Electrical Aspects | Rp4,000,000 |
Hub Admin | 25-26 | Electrical Safety System | Rp4,000,000 |
Hub Admin | 25-26 | Instrumentation and Control on Generators and Turbines | Rp4,000,000 |
Hub Admin | 25-27 | INDUSTRIAL GAS TURBINES (Operation, Maintenance and Troubleshooting) | Rp5,500,000 |
Hub Admin | 25-27 | Power Generation and Electrical Power Distribution | Rp5,500,000 |
Hub Admin | 25-27 | High Voltage Systems and Equipment (Operation and Maintenance) | Rp5,500,000 |
Hub Admin | 25-27 | Safety Instrument System & Control | Rp5,500,000 |
Hub Admin | 25-27 | Electric Power Transformer and Motor (Operation, Maintenance and Trouble Shooting) | Rp5,500,000 |
Hub Admin | 25-27 | Lightning Protection and Grounding Systems | Rp5,500,000 |
Hub Admin | 26-28 | Electrical Instruments, Meters and Indicators | Rp5,500,000 |
Hub Admin | 27-28 | Pipeline (Testing, Inspection and Maintenance) | Rp4,000,000 |
Hub Admin | 27-28 | Electrical Diesel Generator (Operation And Maintenance) | Rp4,000,000 |
Hub Admin | 27-28 | Protection on Generators, Transformers and Networks | Rp4,000,000 |
Hub Admin | 6-7 | Fundamental of Supply Chain Management & Logistic | Rp3,500,000 |
Hub Admin | 6-7 | Vendor Relationship Management | Rp4,000,000 |
Hub Admin | 6-7 | Principles of Land Transportation | Rp4,000,000 |
Hub Admin | 11-12 | Effective Inventory Reduction | Rp3,800,000 |
Hub Admin | 13-14 | Supplier Market Analysis | Rp3,500,000 |
Hub Admin | 13-14 | Owner Estimate Technique | Rp3,800,000 |
Hub Admin | 13-14 | Negotiation Skills | Rp3,800,000 |
Hub Admin | 13-14 | RFID in Warehouse | Rp4,000,000 |
Hub Admin | 18-19 | Basic of Inventory Management & Warehouse Management | Rp3,500,000 |
Hub Admin | 18-19 | Driver Management | Rp3,800,000 |
Hub Admin | 18-19 | Communication Skills in Logistics | Rp4,000,000 |
Hub Admin | 20-21 | Basic of Purchasing Management | Rp3,500,000 |
Hub Admin | 20-21 | Managing People in SCM & Logistic | Rp4,000,000 |
Hub Admin | 20-21 | Vehicle Routing Problem | Rp4,000,000 |
Hub Admin | 20-21 | Manajemen Transportasi | Rp4,000,000 |
Hub Admin | 25-26 | Reverse Logistics | Rp3,800,000 |
Hub Admin | 25-26 | Spare Part Management | Rp3,500,000 |
Hub Admin | 26-27 | Continous Improvement Supply Chain dengan Simulasi Promodel | Rp4,000,000 |
Hub Admin | 27-28 | Production Planning and Scheduling (product by order) | Rp4,000,000 |
Hub Admin | 6-7 | Implementasi OHSAS 18001:2007 | Rp3,500,000 |
Hub Admin | 6-7 | Hazard Communication | Rp4,000,000 |
Hub Admin | 11-12 | Dokumentasi OHSAS 18001:2007 | Rp3,500,000 |
Hub Admin | 11-12 | Industrial Disaster & Emergency Response | Rp4,000,000 |
Hub Admin | 11-12 | Risk Assessment (Analisa Resiko) & JSA (Job Safety Analysis) | Rp4,000,000 |
Hub Admin | 13-14 | Audit Internal OHSAS 18001:2007 | Rp3,500,000 |
Hub Admin | 13-14 | Teknik Instalasi Pengolahan Air Limbah (IPAL) | Rp4,000,000 |
Hub Admin | 13-14 | Teknik Penyusunan dan Pemahaman MSDS | Rp4,000,000 |
Hub Admin | 13-14 | Pengelolaan Limbah Biologis | Rp4,000,000 |
Hub Admin | 18-19 | Dokumentasi ISO 14001:2004 | Rp3,500,000 |
Hub Admin | 18-19 | Green Building and Factory | Rp4,000,000 |
Hub Admin | 18-19 | Behaviour Safety | Rp4,000,000 |
Hub Admin | 20-21 | Pengendalian Bahan Beracun Berbahaya (B3) | Rp4,000,000 |
Hub Admin | 20-21 | Implementasi ISO 14064:2006 (Perhitungan dan Penurunan Emisi Gas Rumah Kaca) | Rp4,000,000 |
Hub Admin | 20-21 | Incident Investigation | Rp4,000,000 |
Hub Admin | 20-21 | Teknik Penanganan Kondisi Tanggap darurat | Rp4,000,000 |
Hub Admin | 20-21 | Ergonomic In Workplace | Rp3,500,000 |
Hub Admin | 25-26 | Internal Audit ISO 14001:2004 | Rp3,500,000 |
Hub Admin | 25-26 | Teknik Penyusunan AMDAL | Rp4,000,000 |
Hub Admin | 25-26 | Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3 - PP No 50 Tahun 2012) | Rp3,500,000 |
Hub Admin | 25-26 | Hazard Operational (HAZOP) | Rp4,000,000 |
Hub Admin | 25-26 | Pengelolaan Limbah Industri | Rp4,000,000 |
Hub Admin | 26-27 | Persiapan Audit Lingkungan (PROPER) | Rp4,000,000 |
Hub Admin | 27-28 | Implementasi ISO 14001:2004 | Rp3,500,000 |
Hub Admin | 27-28 | Process Hazard Analysis Leader | Rp4,000,000 |
Hub Admin | 6-7 | Activity Based Costing | Rp3,500,000 |
Hub Admin | 6-7 | Export Import | Rp3,500,000 |
Hub Admin | 13-14 | Advanced Budgeting and Cost Control | Rp3,500,000 |
Hub Admin | 18-19 | Financial Planning & Decision Making | Rp3,500,000 |
Hub Admin | 20-21 | Finance for Non Finance | Rp3,500,000 |
Hub Admin | 25-26 | Budgeting and Project Cost Control | Rp3,500,000 |
Hub Admin | 27-28 | Cash Management | Rp3,500,000 |
Hub Admin | 6-7 | Customer Satisfaction Survey (Methodology & Statistic) | Rp4,500,000 |
Hub Admin | 13-14 | Marketing Research with SPSS | Rp4,500,000 |
Hub Admin | 20-21 | Advance Statistical Analysis For Marketing Research Using R (Open Source Software) | Rp4,500,000 |
Hub Admin | 25-26 | Marketing Research with MS Excel | Rp4,500,000 |
Hub Admin | 6-7 | HR Management Based Competency | Rp3,500,000 |
Hub Admin | 6-7 | Program Persiapan Pensiun | Rp3,500,000 |
Hub Admin | 6-7 | Hukum Ketenagakerjaan | Rp3,500,000 |
Hub Admin | 6-7 | Fast Track To Be A Super Supervisor | Rp3,500,000 |
Hub Admin | 11-12 | Training Need Analysis | Rp3,500,000 |
Hub Admin | 13-14 | Statistical Performance Control for Employee | Rp3,500,000 |
Hub Admin | 13-14 | Performance Management and Appraisal | Rp3,500,000 |
Hub Admin | 18-19 | Work Load Analysis | Rp3,500,000 |
Hub Admin | 20-21 | Handling Customer Complaint | Rp3,500,000 |
Hub Admin | 20-21 | Design & Evaluation of Training Program | Rp3,500,000 |
Hub Admin | 25-26 | Competency Based Recruitment & Selection | Rp3,500,000 |
Hub Admin | 25-26 | Effective Customer Relationship Management (CRM) | Rp3,500,000 |
Hub Admin | 25-26 | Corporate Social Responsibility (CSR) | Rp3,500,000 |
Hub Admin | 27-28 | HR for Non HR | Rp3,500,000 |
Hub Admin | 27-28 | Human Capital Return on Investment | Rp3,500,000 |
Hub Admin | 6-7 | Teknologi Gasifikasi Batubara dan Penerapannya | Rp5,000,000 |
Hub Admin | 11-12 | Teknologi Pemanfaatan Batubara untuk PLTU | Rp5,000,000 |
Hub Admin | 11-13 | Pengenalan Proses Preparasi Analisis Bahan Galian Industri dan Bahan Galian Logam | Rp5,500,000 |
Hub Admin | 18-19 | Teknik Preparasi, Pengujian dan Analisis Batubara | Rp5,000,000 |
Hub Admin | 18-20 | Pengenalan Pemanfaatan dan Pengolahan Batu Mulia | Rp5,500,000 |
Hub Admin | 20-21 | Coal Preparation Plant & Stockpile Management | Rp5,000,000 |
Hub Admin | 25-26 | Teknologi Batubara Bersih | Rp5,000,000 |
Hub Admin | 27-28 | Teknologi Upgrading Batubara | Rp5,000,000 |
Hub Admin | 6-7 | Implementasi ISO 22000:2005 | Rp3,500,000 |
Hub Admin | 6-7 | Good Manufacturing Practice: Cara Pengolahan Pangan yang Baik | Rp3,500,000 |
Hub Admin | 11-12 | Internal Audit ISO 22000:2005 | Rp3,500,000 |
Hub Admin | 13-14 | Penentuan Kadaluarsa Produk Pangan | Rp3,500,000 |
Hub Admin | 18-19 | Pelatihan Operator Pertanian Organik | Rp3,500,000 |
Hub Admin | 20-21 | Dokumentasi ISO 22000:2005 | Rp3,500,000 |
Hub Admin | 25-26 | Food Safety (HACCP) For Hotel, Restaurant & Catering | Rp3,800,000 |
Hub Admin | 27-28 | GAP & GHP (Good Agriculture Practice & Good Handling Practice) | Rp3,800,000 |
Hub Admin | 11-12 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Perkerasan Jalan Lentur (Flexible Pavement) | Rp4,500,000 |
Hub Admin | 13-14 | Pengendalian Mutu Pekerjaan Beton Semen dan Perencanaan Campuran (Mix Design) | Rp4,500,000 |
Hub Admin | 20-21 | Pelaksanaan dan Pengendalian Mutu Pekerjaan Timbunan Badan Jalan | Rp4,500,000 |
Hub Admin | 25-26 | Pelaksanaan dan Pemeliharaan Jembatan | Rp4,500,000 |
Pelatihan Bandung, Training Bandung, Pelatihan Indonesia, Training Indonesia, Training Laboratorium, Training konsultan Iso
Minggu, 02 Agustus 2015
Jadwal Training Bulan Agustus 2015
Langganan:
Postingan (Atom)